Our projects

REZ Boisbriand

Location | Boisbriand
Address | 1065 Francis-Bourgeois street
Year | 2018
Surface area | 285 000 s.f.
Description | The Residential project REZ located at Faubourg Boisbriand was giving to us by Conception Habitat 2015 to do the formwork of his 7 floors rental building. A 4 months project that has strated in February 2018

 

  • 20180129_115204
  • 20180129_115101
  • 20180129_114907

Le M – Montréal-Est

Location | Montreal-Est
Address | 11300 Notre-Dame street
Year | 2017-2018
Surface area | 352 000 s.q.
Description | The M-Montreal-Est project is one project that Groupe Magma is very proud at this moment. Indeed, our formwork division has the chance to realise this unique project in this area.

 

  • Redim-DDC 2
  • Redim-DDC 1
  • Redim-DDC-3

Domaine des Cascades

Location | Ste-Catherine
Address | 3605 Marie-Victorin Boul, Ste-Catherine
Year | 2017-2018
Surface area | 155 000 p.c.
Description | LEM has shown their confidence by giving us the contract for the enlargement formwork of 8 floors at the Domaine des Cascades in Ste-Catherine’s city. This project began in august 2017 to end in February 2018.

 

Villa Latella

Location | Laval
Address | Chenonceau street
Year | June 2017
Surface area |
Description | We are proud to announce you that we’ve concluded an agreement with la Société Immobilière Villa Latella for the formwork of the new tower in Laval, on Chenonceau street. This project has 2 underground parkings with 12 floors above ground.

 

Lowney-sur-Ville, phase 4

Location | Montreal
Address | 198 Ann street
Year | 2017
Surface area |
Description | Realisation of the concrete work at the Phase 4 of Lowney-sur-Ville project. A 20 floors building located in Montreal.

 

  • maisonneuve-1
  • maisonneuve-2
  • maisonneuve-3

20 Maisonneuve West

Location | Saint-Laurent, Montreal
Address | De Maisonneuve West boulevard
Year | 2016-2017
Surface area | 355 000 s.f.
Description | 22 underground floors and 3 levels of underground parkings.

 

  • bassins-du-havre-1
  • bassins-du-havre-2
  • bassins-du-havre-3
  • bassins-du-havre-4
  • bassins-du-havre-5

Les Bassins du Havre Phases 2B and 3

Location | Montreal | Griffintown
Address | Du Séminaire street
Year | 2016-2017
Surface area | 490 000 s.f.
Description | Here we are! The continuation of the prestigious project Les Bassins du Havre, in Griffintown is launched!. The Groupe Magma’s Structure Division is in charge of Phases 2B and 3. Two new towers with underground parking to be formed and poured.

 

Condominiums Rouge Phase 6

Location | Montreal
Address | Jean-Talon West, between Victoria avenue and Décarie boulevard
Year | 2016-2017
Surface area | 515 000 s.f.
Description | The Rouge Project Phase 6 saw light in july 2017, another Devmont accomplishment . It is with great pride that Groupe Magma will do the formwork for this luxurious condominium of 13 floors plus 3 underground levels.

 

LILO

Location | L'Île-Perrot
Address | Don Quichotte Boulevard
Year | 2016
Surface area | 560 000 s.f.
Description | Groupe Magma completes the formwork and concrete placing for the Lilo Residence at Ile Perrot, as a subtrade of EBC Entrepreneur General, in 2015. Approximatly 560000 sq ft. of formwork , with a basement and 7 floors.

 

  • le-m-lorraine-3
  • le-m-lorraine-1
  • le-m-lorraine-2

Condominiums Le M – Lorraine

Location | Lorraine
Address | Chemin de la Grande-Côte
Year | 2016
Surface area | 350 000 s.f.
Description | Formwork and concreting of a luxurious condominium tower in Lorraine. 7 floors and 2 levels of underground parking. The project also includes the shuttering of an infinity pool on the roof.